A quote is a cost estimate with a margin on top, and the cost estimate is where jobs are won or lost. Build it from the setup, the run rate, the material with waste, and the burden, then let the quantity breaks show the customer why the bigger order is cheaper per piece.

Job

On price. 32% margin = cost / 0.68.

Material

Trim, makeready sheets, spoilage.

1 = charge the full tooling to this quote. 0 = customer owns tooling from a prior job.

Machine & Labor

Depreciation, power, maintenance, and floor space for the machine, fully absorbed.

Payroll taxes, benefits, and workers' comp on top of wage.

Off-machine work: gluing, packing, palletizing.

Packaging, Freight & Overhead

Sales, admin, and plant overhead not in the machine rate.

This Job

Quote Price per Unit
$0.000
Full Cost per Unit
0
Quote Total
0
Machine Hours
0
Gross Profit on Job
0

Cost Breakdown, Quantity Breaks & Quote Pro

Open the full cost breakdown, quantity breaks at half, one, two, and five times the order with price per unit at each, the minimum price that still covers variable cost, and a printable customer quote.

Part of EGP Tools Pro. Free 7-day trial.

Cost Breakdown

ElementJob TotalPer UnitShare

Quantity Breaks

QuantityCost / UnitPrice / UnitOrder TotalGross Profit
Floor Price per Unit
0
covers variable cost only; never quote below
Contribution at Quote
0
price less variable cost, per unit